Flooring Commissioning Process
Seven activities in sequence, with Continuous Monitoring running alongside, performed by the Flooring Commissioning Authority (Flooring CxA) per Flooring Commissioning (Spec Section 01 91 23.73). Non-compliant conditions are reported to the Owner, Architect, and Contractor (OAC); the Contractor corrects the work, and the Flooring CxA re-verifies.
StageDecision / monitoringProceedCorrection
- Requirements AlignmentConfirms the Contract Documents, submittals, and manufacturer's requirements agree. Conflicts reported to the Owner, Architect, and Contractor.
- Commissioning PlanWhat is verified, where, when, and how often.
- Preinstallation MeetingVerification, schedule, and the Hold Point reviewed with the project team.
- Continuous Monitoring, concurrentAir temperature and relative humidity recorded from material delivery through Substantial Completion, with remote access for the Owner.
- Preinstallation VerificationSubstrate testing, substrate condition, material acclimation, and material verified.
- Notice of Verified ReadinessIssued within 1 business day when conditions comply. The Hold Point is released. Installation may proceed.
- Installation VerificationAmbient conditions, adhesive application, and installation procedures observed.
- Final Commissioning ReportDelivered to the Owner at Substantial Completion.
CertiFloor® does not perform testing, take test readings, perform inspection, approve or reject work, direct means and methods, prescribe installation methods, or stop the Work.
Installation does not start until readiness is verified.